MRAPS Document Repository
| Title | Description | Details | Posted |
|---|---|---|---|
| Missouri River Authorized Purposes Study Scoping Summary Report | details | 9/26/2011 | |
| Slides from Spring 2011 Feedback Meetings |
Slides from the Public and Tribal Feedback Meetings held in March and April 2011. These slides (see slides #55 and #57) are updated with the latest MRAPS funding information as of end of April 2011. |
details | 4/27/2011 |
| MRAPS Draft Scoping Summary Report newsletter flyer |
Newsletter announcing MRAPS Draft Scoping Summary Report |
details | 3/7/2011 |
| MRAPS Draft Scoping Summary Report Available Online news release |
News release announcing that the MRAPS Draft Scoping Summary Report is available online. |
details | 3/7/2011 |
| Draft Scoping Summary Report |
The Draft Scoping Summary Report provides the initial Corps responses and conclusions addressing the study scoping comments collected during the summer of 2010 from both the Tribes and the public. |
details | 3/4/2011 |
| February 2011 news release announcing draft scoping report and feedback meetings |
U.S. Army Corps of Engineers news release announcing MRAPS draft scoping summary report to be available online; feedback meetings scheduled. |
details | 2/17/2011 |
| MRAPS Involvement Situation Assessment - Full Report |
Complete report produced by the Osprey Group, summarizing the context in which the Study will be conducted and recommending specific options for the Corps' information sharing, involvement and collaboration and preliminary design of possible processes for Tribal engagement during the Study. |
details | 11/29/2010 |
| Supplemental implementation guidance |
Memorandum provided to aid in the scoping, collaboration, and execution of the study of the Missouri River projects within the Missouri River basin. |
details | 11/24/2010 |
| November 17, 2010 Newsletter |
This newsletter addresses the importance of the comments received throughout the scoping comment period; provides a link to view all public comments online; identifies remaining actions to be conducted under the current fiscal year funding; and encourages tribes to contact the Corps to provide further commentary. |
details | 11/19/2010 |
| Irrigation Map |
This map displays the current in-service Bureau of Reclamation irrigation units of the Pick-Sloan Program. These units were either authorized in the 1944 Flood Control Act, or made part of the Pick-Sloan Program through subsequent legislation. The total acreage of these units is approximately 550,000 acres. |
details | 9/23/2010 |